Chemical Treatment Plans
Knowing what to do with your on-site wastewater is half the battle.
Meet GD05 guidelines and address all resource consent conditions with a chemical treatment plan specific to your site's requirements.
-
Chemical dosing calculations
Bench testing results
Batch dosing
Monitoring and maintenance requirements
Spill contingency plan
-
We can prepare a CTMP within 3 days of receiving the sample at our lab, and we'll always aim for shorter.
-
We'll need a sample of exposed material, a 10L bucket should be perfect for us to test in our lab.
We may also ask about the average flow rate into the site and the catchment area, but this is not a universal requirement.